Washington County is leading a roadway extension project through the Cities of Stillwater, Stillwater Township, and Oak Park Heights. This project aims to address a disconnect in the regional Highway system to complete a connection along the County Highway 15 corridor.
Join us in-person or online to meet the design team, review the proposed design alternative, and to learn about the schedule and next steps for the project.
- When: Tuesday, May 28 from 4 - 6 p.m. (no formal presentation).
- Where: Stillwater Area High School Cafeteria - Enter through main entrance and go right (5701 Stillwater Blvd N, Stillwater, MN 55082).
Open House #3 Postcard (PDF)
Online Engagement Information
If you are unable to attend the in-person open house, there will be an opportunity to review the material shared at the in-person open house on the project website: May 28 — June 11.
www.co.washington.mn.us/58thStreetExtension
There will be no formal presentation or discussion during the online engagement.